T & G flooring may left floating on top of battens
(assuming level floor is available) or fixed as required. Battens must
be notched where pipes cross (notch to suit floor covering fixing), edge
insulation must be fixed to the end of each batten run. 7) Basic construction between joists with infill:-
Insulation should be fixed at the end of each Joist
run to take up any longitudinal expansion. The top of the heating pipes
should be arranged to be approximately level with the top of the joists
to minimise the amount of infill required and thus save weight. 8) Basic construction over joists retaining joist integrity
The infill consists of a 10:1 sand/cement or a 8:1
'Lytag' lightweight aggregate/cement mix with enough water to hold the
mix together, the additional load imposed on the floor by the infill is
approximately 18Kg/m2 for lightweight aggregate infill to 30Kglm2
for sand/cement infill, (includes area taken up by joists of average thickness
and assumes that the battens are Installed at the correct height from
the top of the joists). |
||||||